J
Jurgen
09/09/24
New bathroom with excellent quality and finish
Company that carried out the work: ARW-NYS bv Score: 5 out of 5 Work carried out: Installing a new bathroom in an older home Location: Lier Keywords: "Excellent quality"; "Attention to detail"; "High-end finish"; "Correct price"; "Clean work"; "Good planning"; "Disciplined"; "Clear communication"; "Professional"; "Friendly"; Smooth & professional. Maybe a bit more expensive, but the quality of the work is very good.
JP
Jolien Palinckx
05/01/21
Was ready
Helped us a lot for the right choice of windows and doors. Correct advice given in connection with further renovations. Even after the works, he came by to set some things right. great service
AV
ANJA VANDONINCK
25/02/20
Installation of windows in Deceuninck PVC with high-efficiency glazing
Windows as well as front door and electric garage door
SW
Sandra Wijmans
15/10/19
Front and rear with windows
Installing windows and doors from Deceuninck
LH
Luc Houthuys
12/10/19
Renovation bathroom and kitchen
Dear Mark, Lena and I sincerely wanted to thank you and your team (Raf) for the work already carried out with us. It takes a little effort for us to express our joy in this. A positive vibe is not out of place here. Big thanks.... Must be able....... Mvg Lena and Luc
SV
Steven Verwerft
24/03/19
Replacement of 2 old skylights with modern skylights
Old domes on a flat roof were replaced by two skylights that were insulated and finished with aluminum pleats including HR glass
SV
Steven Verwerft
24/03/19
Renovation terraced house phase 2 (kitchen, storage room, dining room)
Renovation of dining room, storage room, kitchen including demolition and construction of floors, ceilings, occupying walls. Placing new back door, extra toilet together with new plumbing, new central heating boiler and solar water heater. Also completely new electricity. Second renovation with a good team of helpful professionals. Hard workers who perfectly met the tight deadline of 3 weeks while maintaining top quality. Smooth communication and help
BV
Britt Verelst
23/07/18
Total bathroom, new heating elements and new boiler
Complete installation of a new bathroom: furniture, bath, shower, toilet, tiles,... Place new heating elements behind the doors in the bedrooms. Install new Bulex. Demolition old stairs, preparing hall for new stairs.
PS
Peter Schwartz
23/05/17
Bathroom renovation
Bathroom renovation
SV
Steven Verwerft
15/04/17
Partial renovation terraced house
Renovation of complete exterior carpentry including motorized roller shutters Renovation hall (new floor + re-occupying walls and ceiling) Construction of TV wall Electrical cabling for roller shutters, renewal of electricity and data cabling