GB
Germain BEX
16/02/25
Dissatisfied with sloppy and unfinished electrical work
The electrical work was done sloppily, cable and sockets not in the wall, but had to be loose under the cabinets, cut-out slot against the wall was not sealed, plastering not all the way to the floor and unevenly sloppy. Fortunately, these works were hidden when Dovy installed the kitchen and the painter (from jc interiors) provided some solutions for the poor plastering. I think you should think 3 times with a company (actually a developer) that does everything through subcontracting and also demands 90% of the quote before starting the work!!)
